In 2012/13 Blue Beef constructed a 20 tonne per annum production facility as stage one of a plan to expand production capacity to 120 tonne per annum.

In 2012/13 Blue Beef constructed a 20 tonne per annum production facility as stage one of a plan to expand production capacity to 120 tonne per annum.

RADAQUA was contracted to develop the concept, design, construct and commission the facility. RADAQUA has an ongoing relationship with the client to train and mentor the operators in the successful commercial management and operation of the facility.

The facility has performed beyond expectations exceeding target production capacity by 10 – 20% per year through the achievement of exceptionally low FCRs and outstanding SGRs.